HMO Conversion
South Wales
From a derelict house to a five-bed HMO in Bridgend
Project at a glance
Strategy
Derelict house to HMO conversion
Location
Bridgend, South Wales
Bought for
£142,000
Refurb estimate
~£60,000
Expected value
~£270,000
Bedrooms
5
Projected rent
£580 per room
Planning
Drawings done, application next
Leaving the rat race
Uche was still working full time as a project manager when he decided to build income of his own. He attended Rahim’s three-day event and found it gave him enough to get moving. He then joined the programme for more support.
He spent his first four weeks learning, and doesn’t regret it. His view is simple: worry usually comes from not understanding something, so learn it first.
Why this house
Uche already knew how to analyse a deal, and this one ticked his boxes:
- Location: under a mile and a half from the city centre, with a school down the road, a quiet street and two hospitals nearby, which points to steady tenant demand.
- Space: a large footprint, off-road parking and an outbuilding that gave him options.
- Condition: the walls were solid, with no visible damp or structural damage. It needed work, but it wasn’t a money pit.
- Flexibility: if the HMO fell through, it would still make money as a well-finished single let.
The plan
Because it’s an HMO, almost everything is designed around compliance, durability and the tenant. On the site visit, Rahim and the builders walked through the following with Uche.
- Strip out: old carpets, wallpaper, coving, wall heaters and the chimney breasts all go. A steel beam will carry the loads where a chimney is removed.
- Layout: the old living room becomes a double bedroom with an en-suite. The ground floor is reworked so the kitchen, dining and utility areas form one L-shaped space, with built-in wardrobes in the bedrooms.
- Fire safety: fire doors throughout, smoke alarms, tighter gaps on the staircase and non-compliant windows replaced, with extra protection near the entrance.
- Roof and exterior: a leaking flat roof gets a new waterproof covering over the existing concrete. The cladding comes off, window sills are painted black and the vents stay so the house can breathe.
- Windows: good frames are kept. A faulty hinge is a repair, not a reason to replace a window.
- Heating: gas central heating rather than all-electric. It’s cheaper to run, and one boiler means no tenant can leave a room heater on all day.
- Finishes: laminate in the bedrooms, vinyl in the kitchen, bathrooms and corridors, three double sockets in each bedroom and a damp-proof course injected before plastering.
- Outbuilding: one wall may be rebuilt, because it risks collapse.
Getting planning right
Bridgend has no Article 4 direction, but an HMO there still needs planning permission. Uche instructed an architect, who has measured the house and is finalising the drawings. The council is expected to want individual parking spaces rather than tandem parking, so the driveway is being planned around that from the start.
The numbers
| Purchase price | £142,000 |
| Refurb estimate | ~£60,000 |
| Total invested | ~£202,000 |
| Expected value | ~£270,000 |
| Rent (5 rooms at £580) | £2,900 a month |
| Annual rent | £34,800 |
| Costs (assumed at 40%) | ~£14,000 |
| Net income | ~£20,800 a year (about 10.3%) |
Uche used the conservative end of local room rents (£570–650) rather than the best case. And if the HMO isn’t approved, the finished house would still make a profit as a single let.
Keeping the money working
Planning can take 8–12 weeks, during which the project is out of the investor’s hands. Rahim’s approach is to use that time. While the application is pending, the investor buys a smaller house that needs no planning, refurbishes it and remortgages, so the capital is recycled rather than sitting idle. By the time the HMO is cleared for work, the second property has returned its money. Uche plans to start looking for that second deal this month.
Want results like this?